Institute for Transportation and Development Policy

Promoting sustainable and equitable transportation worldwide

  • 中文
  •  
    • Who We Are
      • ITDP China
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • 0ther Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
      BRT Database > 
    • Year system commenced
    • Peak throughput (passengers/hr/direction)
    • City centre peak hour speed
    • Peak city centre buses/hr/direction
    • BRT system coverage (2-way roads) (1 fare)
    • Total length of dedicated busway
    • Length including mixed traffic portions
    • Number of BRT stations
    • Average distance between stations
    • Number of corridors
    • Routes operating both inside & outside BRT roads
    • Stations with functioning passing lanes
    • Routes operating only in busway corridors
    • Location of busway lanes
    • Highest peak hour boardings at a single station
    • Highest full-day boardings at a single station
    • Location of bus doorways
    • Number of BRT terminals
    • Number of BRT depots
    • System passenger-trips per day
    • Fleet of special BRT buses
    • Fleet of integrated BRT feeder buses
    • Median cash fare
    • Median smart card fare
    • Preliminary planning and design costs
    • Infrastructure cost per km
    • BRT bus operator(s)
    • 12m BRT bus cost
    • Number of doors in BRT buses
    • BRT vehicle length
    • No. of seats in 12m BRT buses
    • No. of seats in 18m BRT buses
    • BRT vehicle fuel
    • BRT bus manufacturer
    • Lead local design / planning work
    • Lead international design / planning work
    • Project website
    • BRT management agency
    • Operational mode
    • Station platform height
    • Average bus occupancy (peak hour, direction & point)
    • Longest BRT station (non terminal)
    • Shortest BRT station
    • Most station substops
    • Fare type (flat fare or distance-based)
    • Number of turnstiles/gates per entry (median)
    • Type of fare collection / verification technology
    • Urban area inhabitants
    • Public transport mode share (%, excluding walking)
    • Major prizes
    • BRT Standard score (GOLD, SILVER, BRONZE)
    • Fare system vendor
    • Sliding door system vendor
    • Surveillance system vendor
    • Operating hours
    • System name
    • Fleet of regular buses using BRT stations
    • Station platform width (including walls & doors)
    • Type of lane divider
    • Station platform clear width (usable by passengers)
    • Infrastructure financing source
    • 18m BRT bus cost
    • Fleet of 18m or larger BRT buses
     > Infrastructure cost per km:
    • Xiamen:
        10 billion yuan for 48.9km   2008 value. Baidu Baike. ~35km elevated
    • Kuala Lumpur:
        111 million MYR   2015 value. US$26 million
    • Brisbane:
        AU$27.6 million   2001 value. SE Busway - later corridors higher cost (value shown: 24)
    • Islamabad:
        US$20 million   2015 value
    • Cali:
        US$14.44 million   2012 value. Source: IADB 2015
    • Los Angeles:
        US$14.3 million   2005 value. $35.8m for Chatsworth extension in 2012
    • Amsterdam:
        US$11m   Source: bic.asn.au
    • Lima:
        $9.67 million   2010 value. US$262m for first corridor
    • Seoul:
        US$1.2 million   US$1.2m
    • Bogota:
        US$5.3m (phase 1), $13.3m (phase 2)   US$5.3m (phase 1), $13.3m (phase 2)
    • Nantes:
        7.58m euros   2006 value. 50m euros for the 6.6km
    • Istanbul:
        US$8.8 million   2007 value. Includes infrastructure & equipment (Source: IETT)
    • Lanzhou:
        595m yuan for 12.3km   2012 value
    • Paris:
        6.43m euros   Based on cost of 7km Marché international de Rungis to La Croix de Berny stations in 2005 (45m euros)
    • Yichang:
        44.8m yuan   2014 value. Not including some land acquisition
    • Beijing:
        40m yuan   1st corridor only. US$4.8m at Jul-04 rate
    • Guangzhou:
        30m yuan   US$4.4m, Jul-09 rate
    • Changzhou:
        30m yuan   1st corridor only US$4m at Jul-07 rate
    • Dalian:
        19.5million yuan   US$2.6m, Jul-07 rate
    • Yinchuan:
        420m yuan for 21km   2012 value. Total cost source: Baidu Baike
    • Ahmedabad:
        US$2.4 million   2009 value. US$2.4m, first 12.5km only
    • Pune:
        13 crore INR   2015 value
    • Guayaquil:
        US$2.2 million   US$2.2m for line 1, $1.5m for line 3
    • Leon:
        US$1m   Source: bic.asn.au
    • Jakarta:
        US$1 million   2004 value
    • Zhongshan:
        110 m yuan for 12.9km   2014 value
    • Who We Are
      • ITDP-CHINA
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • Other Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
    • 11th Floor, Zhujiang Planning Building Jianshe Dama Lu, Guangzhou, China. 510060
    • phone: (86-20) 83860931
    • Rm 43, 8/F, Beijing International Hotel, #9 Jianguomennei Avenue, Beijing, China. 100001
    • phone: (86-10) 85323451
    • chinaoffice@itdp.org
    © 2016 ITDP