Institute for Transportation and Development Policy

Promoting sustainable and equitable transportation worldwide

  • 中文
  •  
    • Who We Are
      • ITDP China
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • 0ther Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
      BRT Database > 
    • Ahmedabad
    • Amsterdam
    • Bangkok
    • Beijing
    • Bogota
    • Brisbane
    • Bunous Aires
    • Cali
    • Cape Town
    • Changde
    • Changzhou
    • Chengdu
    • Curitiba
    • Dalian
    • Fuzhou
    • Guangzhou
    • Guayaquil
    • Guiyang
    • Hangzhou
    • Hefei
    • Islamabad
    • Istanbul
    • Jakarta
    • Jinan
    • Johannesburg
    • Kuala Lumpur
    • Lanzhou
    • Leon
    • Lianyungang
    • Lima
    • Los Angeles
    • Mexico City
    • Nagoya
    • Nanning
    • Nantes
    • Paris
    • Pune
    • Quito
    • Seoul
    • Shaoxing
    • Urumqi
    • Utrecht
    • Wenzhou
    • Wuhan
    • Xiamen
    • Yancheng
    • Yichang
    • Yinchuan
    • Yongzhou
    • Zaozhuang
    • Zhengzhou
    • Zhongshan
    • Zhoushan
     > Beijing : [Updated Time( 2015-06-16)]
    • BRT Basics:
    • Segregated busways or bus-only roadways:
    • Pre-board fare collection and fare verification:
    • Level boarding and alighting:
      [level but sometimes large gap]
    • Signal priority or grade separation at intersections:
    • Year system commenced:
        2004   [corridors 2 & 3 opened in August 2008; corridor 4 opened in 2012]
    • Peak throughput (passengers/hr/direction):
        2,298   [17-May-2019, South of Tiantan, AM peak, south-north]
      1,030(2018年3月29日,天坛以南,晚高峰,北-南,29-Mar-2018, South of Tiantan, PM peak, north-south)
    • City centre peak hour speed:
        17.8 km/h   [16-May-2019, AM peak, south-north]
      18km/h,16-20 km/h(2013年1月1日,30-Mar-2018, PM peak, north-south)
    • Peak city centre buses/hr/direction:
        18   [9-Mar-2018, South of Tiantan, PM peak, north-south]
    • Total length of dedicated busway:
        59 km   [14/9.5/11/24.5km corridor 1/2/3/4]
    • Length including mixed traffic portions:
        79 km   [16km/15km/23km/25km corridor 1/2/3/4]
    • Location of busway lanes:
        Centre of roadway   [Left of service lane in corridors 2, 3, 4]
    • Number of BRT terminals:
        4  
    • System name:
        Beijing BRT  
    • Operation and Service:
    • Network of routes and corridors:
      [3 lines, but no interconnections]
    • High peak period operational speed (>20km/hr):
      [Not in corridors 2 and 3]
    • Most bus passengers in BRT corridors carried by BRT buses:
    • Net time saving for bus passengers in corridor:
      [Unlikely in corridor 1; not in corridors 2 or 3]
    • Throughput >10,000 passengers/hr (one direction):
    • Throughput >20,000 passengers/hr (one direction):
    • Carries more than a mixed traffic lane (3000 pphpd):
    • Payment per bus-kilometre rather than per passenger:
    • Buses operating both in & out of BRT corridors:
      [Only 1 route in 4 corridors]
    • Competitively bid operating contracts:
    • More than one BRT bus operator:
    • No operational subsidy from government:
      [subsidy needed]
    • System control centre:
    • BRT authority plans and controls the system:
    • BRT system coverage (2-way roads) (1 fare):
        79 km  
    • Number of corridors:
        4  
    • Routes operating both inside & outside BRT roads:
        1   [B3s]
    • Routes operating only in busway corridors:
        5   [2/1/1/1 in corridors 1/2/3/4]
    • Median cash fare:
        2 yuan   [2 RMB for 1st 10km and 1RMB for each additional 5km, 50% off for smart card]
    • Median smart card fare:
        1 yuan   [50% off for smart card]
    • BRT management agency:
        Beijing Public Transport Holdings, Ltd. (BPT)  
    • Operational mode:
        trunk-only  
    • Average bus occupancy (peak hour, direction & point):
        95  
    • Fare type (flat fare or distance-based):
        distance-based   [2 RMB for 1st 10km and 1RMB for each additional 5km, 50% off for smart card, started 26-Dec-2014]
    • Fleet of regular buses using BRT stations:
        0  
    • Stations:
    • Sliding doors in BRT stations:
      [Newer stations have sliding doors]
    • Station size based on passenger demand:
    • Full weather protection on most station platforms:
    • Full weather protection on all station platforms:
    • Covered station access:
    • Escalators/lifts at >20% of stations with bridges/tunnels:
    • >1 substop at >75% of stations (requires overtaking):
    • >1 stop position at stopping area at >75% of stations:
    • Real-time CCTV surveillance at all stations:
    • Number of BRT stations:
        78   [17/20/22/19 corridors 1/2/3/4]
    • Average distance between stations:
        940m   [940m/790m/1000m corridor 1/2/3]
    • Location of bus doorways:
        Right side   [left side in corridor 1]
    • Station platform height:
        35cm  
    • Longest BRT station (non terminal):
        75m  
    • Shortest BRT station:
        40m  
    • Most station substops:
        1  
    • Infrastructure:
    • Enhanced station (more than just a bus shelter):
    • Overtaking lanes at more than 75% of stations:
    • Includes BRT-only tunnels or bridges:
    • Low-emission vehicle technology (≥Euro III):
    • Automated fare collection and fare verification:
    • Stations away from intersections:
    • Physical BRT laneway dividers:
    • Stations with functioning passing lanes:
        0  
    • Number of BRT depots:
        2  
    • Fare system vendor:
        Jiangsu Huimin  
    • Sliding door system vendor:
        Jiangsu Huimin  
    • Surveillance system vendor:
        Qingdao Hisense  
    • Communications:
    • Distinctive BRT buses:
      [Difficult to distinguish from many non-BRT articulated buses]
    • Real-time next bus information displays:
    • Distinctive marketing identity for system:
      [Beijing BRT]
    • High-quality passenger information at stations:
    • High-quality passenger information on buses:
    • Distinctive BRT stations:
    • Access and Integration:
    • Bicycle parking at BRT stations:
      [Some in corridor 4]
    • Segregated bike lanes along main corridor(s):
    • Wheelchair accessible stations:
    • Improvements to nearby public space:
      [Partial in corridor 1, but not in later corridors]
    • Bike sharing in vicinity of BRT stations:
    • Fleet of integrated BRT feeder buses:
        0  
    • BRT Vehicle:
    • High capacity BRT buses:
    • Fleet of special BRT buses:
        319   [87 18m corr 1; 100 18m and 8 18m trolleybus corr 3; 100 corr 4]
    • Number of doors in BRT buses:
        4   [3 in corridor 1]
    • BRT vehicle length:
        18.5m  
    • BRT vehicle fuel:
        diesel, LNG, electric   [CNG in first corridor 1 buses, discontinued]
    • BRT bus manufacturer:
        Jinhua Neoplan, Beijing Futian, Beijing Trolleybus Factory   [trolleybuses were JV with Jinhua Neoplan]
    • Lead international design / planning work:
        Energy Foundation  
    • 18m BRT bus cost:
        1.6millon yuan   [Initial Iveco CNG buses cost $350,000; later Neoplan diesel buses $250,000]
    • Fleet of 18m or larger BRT buses:
        319  
    • Others:
    • Buses paid for by operators rather than government:
    • Preliminary planning and design costs:
        6 million yuan   [1st corridor only]
    • Infrastructure cost per km:
        40m yuan   [1st corridor only. US$4.8m at Jul-04 rate]
    • BRT Standard score (GOLD, SILVER, BRONZE):
        Basic BRT   [Corridor 1 is Bronze, others Basic BRT or non-BRT]
  •  No
     Yes
     Partial
    • Who We Are
      • ITDP-CHINA
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • Other Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
    • 11th Floor, Zhujiang Planning Building Jianshe Dama Lu, Guangzhou, China. 510060
    • phone: (86-20) 83860931
    • Rm 43, 8/F, Beijing International Hotel, #9 Jianguomennei Avenue, Beijing, China. 100001
    • phone: (86-10) 85323451
    • chinaoffice@itdp.org
    © 2016 ITDP