Institute for Transportation and Development Policy

Promoting sustainable and equitable transportation worldwide

  • 中文
  •  
    • Who We Are
      • ITDP China
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • 0ther Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
      BRT Database > 
    • Ahmedabad
    • Amsterdam
    • Bangkok
    • Beijing
    • Bogota
    • Brisbane
    • Bunous Aires
    • Cali
    • Cape Town
    • Changde
    • Changzhou
    • Chengdu
    • Curitiba
    • Dalian
    • Fuzhou
    • Guangzhou
    • Guayaquil
    • Guiyang
    • Hangzhou
    • Hefei
    • Islamabad
    • Istanbul
    • Jakarta
    • Jinan
    • Johannesburg
    • Kuala Lumpur
    • Lanzhou
    • Leon
    • Lianyungang
    • Lima
    • Los Angeles
    • Mexico City
    • Nagoya
    • Nanning
    • Nantes
    • Paris
    • Pune
    • Quito
    • Seoul
    • Shaoxing
    • Urumqi
    • Utrecht
    • Wenzhou
    • Wuhan
    • Xiamen
    • Yancheng
    • Yichang
    • Yinchuan
    • Yongzhou
    • Zaozhuang
    • Zhengzhou
    • Zhongshan
    • Zhoushan
     > Yancheng : [Updated Time( 2015-07-10)]
    • BRT Basics:
    • Segregated busways or bus-only roadways:
    • Pre-board fare collection and fare verification:
    • Level boarding and alighting:
    • Signal priority or grade separation at intersections:
    • Year system commenced:
        2010   [Opened 1 May]
    • Peak throughput (passengers/hr/direction):
        1,760   [3-Jul-2015, South of Daqing Lu station, PM peak, south-north]
    • City centre peak hour speed:
        18 km/hr   [3-July-2015,AM & PM peak surveys, (same in Aug-2011)]
    • Peak city centre buses/hr/direction:
        39   [3-Jul-2015, South of Daqing Lu station, PM peak, south-north]
    • Total length of dedicated busway:
        16 km  
    • Length including mixed traffic portions:
        16 km  
    • Location of busway lanes:
        Centre of roadway  
    • System name:
        BRT  
    • Operation and Service:
    • Network of routes and corridors:
    • High peak period operational speed (>20km/hr):
    • Most bus passengers in BRT corridors carried by BRT buses:
    • Net time saving for bus passengers in corridor:
    • Throughput >10,000 passengers/hr (one direction):
    • Throughput >20,000 passengers/hr (one direction):
    • Carries more than a mixed traffic lane (3000 pphpd):
    • Payment per bus-kilometre rather than per passenger:
    • Buses operating both in & out of BRT corridors:
    • Competitively bid operating contracts:
    • More than one BRT bus operator:
    • No operational subsidy from government:
      [subsidy needed]
    • BRT system coverage (2-way roads) (1 fare):
        15 km  
    • Number of corridors:
        2  
    • Routes operating both inside & outside BRT roads:
        8   [B1, B2, Feeders 1, 2, 3, 4, 5, 6]
    • Routes operating only in busway corridors:
        0  
    • Median cash fare:
        1 yuan  
    • Median smart card fare:
        0.9 yuan  
    • BRT bus operator(s):
        Yancheng Public Transport Corporation  
    • BRT management agency:
        Yancheng Public Transport Corporation  
    • Operational mode:
        direct-service  
    • Average bus occupancy (peak hour, direction & point):
        46  
    • Fare type (flat fare or distance-based):
        flat fare  
    • Operating hours:
        6:00am-10:00pm  
    • Stations:
    • Sliding doors in BRT stations:
    • Station size based on passenger demand:
    • Full weather protection on most station platforms:
    • Full weather protection on all station platforms:
    • Covered station access:
    • Escalators/lifts at >20% of stations with bridges/tunnels:
    • >1 substop at >75% of stations (requires overtaking):
    • >1 stop position at stopping area at >75% of stations:
    • Number of BRT stations:
        25  
    • Average distance between stations:
        690m  
    • Location of bus doorways:
        Right side   [traffic is on the right. 2 routes have doors in both sides]
    • Most station substops:
        1  
    • Infrastructure:
    • Enhanced station (more than just a bus shelter):
    • Overtaking lanes at more than 75% of stations:
    • Includes BRT-only tunnels or bridges:
    • Automated fare collection and fare verification:
    • Stations away from intersections:
    • Stations with functioning passing lanes:
        0  
    • Fare system vendor:
        Jiangsu Huimin  
    • Sliding door system vendor:
        Jiangsu Huimin  
    • Surveillance system vendor:
        Yinjiang Co.  
    • Communications:
    • Distinctive BRT buses:
    • Real-time next bus information displays:
      [Displays present but not functioning]
    • Distinctive marketing identity for system:
      [BRT]
    • High-quality passenger information on buses:
    • Audio announcements on BRT buses:
    • Distinctive BRT stations:
    • Access and Integration:
    • Bicycle parking at BRT stations:
    • Segregated bike lanes along main corridor(s):
    • Wheelchair accessible stations:
    • Improvements to nearby public space:
    • Bike sharing in vicinity of BRT stations:
    • Fleet of integrated BRT feeder buses:
        30   [Feeder 1' 10; 'Feeder 2' 20]
    • BRT Vehicle:
    • High capacity BRT buses:
    • Fleet of special BRT buses:
        134   [20 18m and 114 12m]
    • Number of doors in BRT buses:
        3   [2 in the 12m buses. 2 in both sides for B2 & B2-feeder]
    • BRT vehicle length:
        12m, 18m  
    • No. of seats in 18m BRT buses:
        50  
    • BRT vehicle fuel:
        diesel  
    • BRT bus manufacturer:
        Zonda, Yutong  
    • Fleet of 18m or larger BRT buses:
        20  
    • Others:
    • Buses paid for by operators rather than government:
    • BRT Standard score (GOLD, SILVER, BRONZE):
        BRONZE  
  •  No
     Yes
     Partial
    • Who We Are
      • ITDP-CHINA
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • Other Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
    • 11th Floor, Zhujiang Planning Building Jianshe Dama Lu, Guangzhou, China. 510060
    • phone: (86-20) 83860931
    • Rm 43, 8/F, Beijing International Hotel, #9 Jianguomennei Avenue, Beijing, China. 100001
    • phone: (86-10) 85323451
    • chinaoffice@itdp.org
    © 2016 ITDP