Institute for Transportation and Development Policy

Promoting sustainable and equitable transportation worldwide

  • 中文
  •  
    • Who We Are
      • ITDP China
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • 0ther Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
      BRT Database > 
    • Ahmedabad
    • Amsterdam
    • Bangkok
    • Beijing
    • Bogota
    • Brisbane
    • Bunous Aires
    • Cali
    • Cape Town
    • Changde
    • Changzhou
    • Chengdu
    • Curitiba
    • Dalian
    • Fuzhou
    • Guangzhou
    • Guayaquil
    • Guiyang
    • Hangzhou
    • Hefei
    • Islamabad
    • Istanbul
    • Jakarta
    • Jinan
    • Johannesburg
    • Kuala Lumpur
    • Lanzhou
    • Leon
    • Lianyungang
    • Lima
    • Los Angeles
    • Mexico City
    • Nagoya
    • Nanning
    • Nantes
    • Paris
    • Pune
    • Quito
    • Seoul
    • Shaoxing
    • Urumqi
    • Utrecht
    • Wenzhou
    • Wuhan
    • Xiamen
    • Yancheng
    • Yichang
    • Yinchuan
    • Yongzhou
    • Zaozhuang
    • Zhengzhou
    • Zhongshan
    • Zhoushan
     > Yichang : [Updated Time( 2023-10-11)]
    • BRT Basics:
    • Segregated busways or bus-only roadways:
    • Pre-board fare collection and fare verification:
    • Level boarding and alighting:
    • Signal priority or grade separation at intersections:
    • Year system commenced:
        2015   [Opened 15 July]
    • Peak throughput (passengers/hr/direction):
        5,400   [4-Aug-2015, South of Gezhouba Stn, AM peak, north-south]
    • City centre peak hour speed:
        20 km/hr   [3-Aug-2015 to 7-Aug-2015,Multiple surveys, AM and PM peak]
    • Peak city centre buses/hr/direction:
        94   [4-Aug-2015, Gezhouba Stn, AM peak, north-south]
    • Total length of dedicated busway:
        17km  
    • Length including mixed traffic portions:
        23.5km  
    • Location of busway lanes:
        Centre of roadway  
    • Number of BRT terminals:
        1  
    • System name:
        Yichang BRT  
    • Operation and Service:
    • Network of routes and corridors:
    • High peak period operational speed (>20km/hr):
    • Most bus passengers in BRT corridors carried by BRT buses:
    • Net time saving for bus passengers in corridor:
    • Throughput >10,000 passengers/hr (one direction):
    • Throughput >20,000 passengers/hr (one direction):
    • Carries more than a mixed traffic lane (3000 pphpd):
    • Payment per bus-kilometre rather than per passenger:
    • Buses operating both in & out of BRT corridors:
    • Competitively bid operating contracts:
    • More than one BRT bus operator:
    • No operational subsidy from government:
      [subsidy needed]
    • Independently operated fare collection system:
    • Oversight from an independent entity/agency:
      [Yichang BRT Management Co. is under bus company]
    • System control centre:
    • BRT authority plans and controls the system:
    • Number of corridors:
        1  
    • Routes operating both inside & outside BRT roads:
        20  
    • Routes operating only in busway corridors:
        2   [B9 and B9 express]
    • System passenger-trips per day:
        240,000   [ridership on 10 August 2015, not including transfers]
    • Median cash fare:
        2 yuan  
    • Median smart card fare:
        1.6 yuan  
    • BRT bus operator(s):
        Yichang Bus Company  
    • BRT management agency:
        Yichang BRT Management Company   [A unit of Yichang Bus Co.]
    • Operational mode:
        direct-service  
    • Average bus occupancy (peak hour, direction & point):
        57  
    • Fare type (flat fare or distance-based):
        flat fare  
    • Type of fare collection / verification technology:
        Card, cash  
    • Operating hours:
        5:30am-11:00pm  
    • Fleet of regular buses using BRT stations:
        162  
    • Stations:
    • Sliding doors in BRT stations:
    • Station size based on passenger demand:
    • Full weather protection on most station platforms:
    • Full weather protection on all station platforms:
    • >1 substop at >75% of stations (requires overtaking):
    • >1 stop position at stopping area at >75% of stations:
    • Real-time CCTV surveillance at all stations:
    • Number of BRT stations:
        38  
    • Average distance between stations:
        640m  
    • Location of bus doorways:
        Both sides   [traffic is on the right]
    • Station platform height:
        35cm  
    • Most station substops:
        2  
    • Number of turnstiles/gates per entry (median):
        5   [2 entry, 3 exit]
    • Station platform width (including walls & doors):
        5m  
    • Infrastructure:
    • Enhanced station (more than just a bus shelter):
    • Overtaking lanes at more than 75% of stations:
    • Includes BRT-only tunnels or bridges:
    • Low-emission vehicle technology (≥Euro III):
    • Automated fare collection and fare verification:
    • Stations away from intersections:
    • Physical BRT laneway dividers:
      [Still being installed]
    • Stations with functioning passing lanes:
        100%  
    • Number of BRT depots:
        1  
    • Fare system vendor:
        Jiangsu Huimin  
    • Sliding door system vendor:
        Jiangsu Huimin  
    • Surveillance system vendor:
        Qingdao Hisense  
    • Communications:
    • Distinctive BRT buses:
    • Real-time next bus information displays:
    • Distinctive marketing identity for system:
    • High-quality passenger information at stations:
    • High-quality passenger information on buses:
    • Audio announcements on BRT buses:
    • Distinctive BRT stations:
    • Access and Integration:
    • Segregated bike lanes along main corridor(s):
      [Yes, but encroached upon in some areas]
    • Wheelchair accessible stations:
    • Improvements to nearby public space:
    • Bike sharing in vicinity of BRT stations:
    • BRT Vehicle:
    • High capacity BRT buses:
    • Fleet of special BRT buses:
        200   [170 12m and 30 18m]
    • 12m BRT bus cost:
        546,600 yuan  
    • Number of doors in BRT buses:
        4   [6 in the 18m buses]
    • BRT vehicle length:
        12m, 18m   [170 12m, 30 18m]
    • No. of seats in 12m BRT buses:
        33  
    • No. of seats in 18m BRT buses:
        39  
    • BRT vehicle fuel:
        CNG, Electricity  
    • BRT bus manufacturer:
        Yutong, BYD, Guangtong  
    • Lead local design / planning work:
        Guangzhou Municipal Engineering Design Research Institute  
    • Lead international design / planning work:
        ITDP-China  
    • 18m BRT bus cost:
        1.48millon yuan  
    • Fleet of 18m or larger BRT buses:
        30  
    • Others:
    • Buses paid for by operators rather than government:
    • Infrastructure cost per km:
        44.8m yuan   [2014 value. Not including some land acquisition]
    • Urban area inhabitants:
        1.2 million  
    • BRT Standard score (GOLD, SILVER, BRONZE):
        GOLD  
    • Infrastructure financing source:
        ADB 62%, city 8%, commercial banks 30%  
  •  No
     Yes
     Partial
    • Who We Are
      • ITDP-CHINA
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • Other Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
    • 11th Floor, Zhujiang Planning Building Jianshe Dama Lu, Guangzhou, China. 510060
    • phone: (86-20) 83860931
    • Rm 43, 8/F, Beijing International Hotel, #9 Jianguomennei Avenue, Beijing, China. 100001
    • phone: (86-10) 85323451
    • chinaoffice@itdp.org
    © 2016 ITDP