Institute for Transportation and Development Policy

Promoting sustainable and equitable transportation worldwide

  • 中文
  •  
    • Who We Are
      • ITDP China
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • 0ther Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
      BRT Database > 
    • Ahmedabad
    • Amsterdam
    • Bangkok
    • Beijing
    • Bogota
    • Brisbane
    • Bunous Aires
    • Cali
    • Cape Town
    • Changde
    • Changzhou
    • Chengdu
    • Curitiba
    • Dalian
    • Fuzhou
    • Guangzhou
    • Guayaquil
    • Guiyang
    • Hangzhou
    • Hefei
    • Islamabad
    • Istanbul
    • Jakarta
    • Jinan
    • Johannesburg
    • Kuala Lumpur
    • Lanzhou
    • Leon
    • Lianyungang
    • Lima
    • Los Angeles
    • Mexico City
    • Nagoya
    • Nanning
    • Nantes
    • Paris
    • Pune
    • Quito
    • Seoul
    • Shaoxing
    • Urumqi
    • Utrecht
    • Wenzhou
    • Wuhan
    • Xiamen
    • Yancheng
    • Yichang
    • Yinchuan
    • Yongzhou
    • Zaozhuang
    • Zhengzhou
    • Zhongshan
    • Zhoushan
     > Wenzhou : [Updated Time( 2018-05-11)]
    • BRT Basics:
    • Segregated busways or bus-only roadways:
    • Pre-board fare collection and fare verification:
    • Signal priority or grade separation at intersections:
    • Level boarding and alighting:
    • Year system commenced:
        2015   [opened on 27-Dec-15, the extension opened on 9-Feb-2018; the second one opened on 13-Feb-2018]
    • System name:
        Wenzhou BRT  
    • Location of busway lanes:
        B1: Center of roadway; B2: Curbside  
    • Operation and Service:
    • Network of routes and corridors:
    • Buses operating both in & out of BRT corridors:
    • More than one BRT bus operator:
    • Throughput >10,000 passengers/hr (one direction):
    • Throughput >20,000 passengers/hr (one direction):
    • System control centre:
    • Operational mode:
        direct-service  
    • Routes operating both inside & outside BRT roads:
        14   [B101-B113 & B2]
    • Routes operating only in busway corridors:
        3   [B1&B1s &B2]
    • System passenger-trips per day:
        130,000   [http://www.zjt.gov.cn/art/2016/4/14/art_18_923502.html]
    • Fare type (flat fare or distance-based):
        flat fare  
    • Median cash fare:
        2 yuan  
    • Number of corridors:
        2   [B1 & B2]
    • Type of fare collection / verification technology:
        Cash/Card/Alipay  
    • BRT bus operator(s):
        Wenzhou Transportation Group  
    • Stations:
    • >1 substop at >75% of stations (requires overtaking):
    • >1 stop position at stopping area at >75% of stations:
    • Sliding doors in BRT stations:
    • Station size based on passenger demand:
    • Full weather protection on most station platforms:
    • Full weather protection on all station platforms:
    • Covered station access:
    • Escalators/lifts at >20% of stations with bridges/tunnels:
    • Real-time CCTV surveillance at all stations:
    • Number of BRT stations:
        35   [21 stations in corridor 1 and 14 stations in corridor 2]
    • Most station substops:
        1  
    • Longest BRT station (non terminal):
        60 m  
    • Shortest BRT station:
        60 m  
    • Station platform width (including walls & doors):
        3 m  
    • Average distance between stations:
        820 m  
    • Number of turnstiles/gates per entry (median):
        4   [2 for exit and 2 for enter]
    • Location of bus doorways:
        Right side   [traffic is on the right]
    • Infrastructure:
    • Enhanced station (more than just a bus shelter):
    • Overtaking lanes at more than 75% of stations:
    • Includes BRT-only tunnels or bridges:
    • Stations away from intersections:
    • Low-emission vehicle technology (≥Euro III):
    • Automated fare collection and fare verification:
    • Stations with functioning passing lanes:
        0  
    • Sliding door system vendor:
        Jiangsu Huimin Traffic Facility Co., Ltd  
    • Fare system vendor:
        Zhejiang Dijieman Information Technology Co., Ltd.  
    • Surveillance system vendor:
        Aole Technology Co., Ltd.  
    • Communications:
    • Real-time next bus information displays:
    • Distinctive marketing identity for system:
    • Distinctive BRT stations:
    • Distinctive BRT buses:
    • High-quality passenger information at stations:
    • High-quality passenger information on buses:
    • Audio announcements on BRT buses:
    • Access and Integration:
    • Bike sharing in vicinity of BRT stations:
    • Wheelchair accessible stations:
    • Bicycle parking at BRT stations:
    • Segregated bike lanes along main corridor(s):
    • BRT Vehicle:
    • Fleet of special BRT buses:
        183   [https://mp.weixin.qq.com/s?src=3&timestamp=1526261248&ver=1&signature=sQKDi301TD*EfpUZ-IW0zBHynlRSK4ABxdK1nY7iBDTULk9YvyU5J4dTghhKFPsetmAOaKtpMztVtjleQIbNTBoIAaXos0jpcyE7h*f43v58iZpm9uW9K4YXLJzRAP5OEcM-hwroKRLO3USsSMFoMw==]
    • 18m BRT bus cost:
        2.5 million  
    • Number of doors in BRT buses:
        3   [3 for 18 m buses]
    • BRT vehicle length:
        12 m & 18 m  
    • No. of seats in 12m BRT buses:
        34   [https://mp.weixin.qq.com/s?src=3&timestamp=1526007979&ver=1&signature=QQ24LiHn9USCnKU0yEC8Cc4QtwCszOzQB1dyVR5gxqfk1EME9zulf99*PIPf*ws8kj6ZIMpSPDz8ZdvT1beiB82doUTzDOQ9OsTEgVppuipF5dVF8d0IkdW7r6h*pgaMunQz*5hqFFkH5n587OQJuw]
    • No. of seats in 18m BRT buses:
        44   [https://mp.weixin.qq.com/s?src=3&timestamp=1526007979&ver=1&signature=QQ24LiHn9USCnKU0yEC8Cc4QtwCszOzQB1dyVR5gxqfk1EME9zulf99*PIPf*ws8kj6ZIMpSPDz8ZdvT1beiB82doUTzDOQ9OsTEgVppuipF5dVF8d0IkdW7r6h*pgaMunQz*5hqFFkH5n587OQJuw]
    • BRT vehicle fuel:
        electric  
    • BRT bus manufacturer:
        Youngman, Yutong  
    • Others:
  •  No
     Yes
     Partial
    • Who We Are
      • ITDP-CHINA
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • Other Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
    • 11th Floor, Zhujiang Planning Building Jianshe Dama Lu, Guangzhou, China. 510060
    • phone: (86-20) 83860931
    • Rm 43, 8/F, Beijing International Hotel, #9 Jianguomennei Avenue, Beijing, China. 100001
    • phone: (86-10) 85323451
    • chinaoffice@itdp.org
    © 2016 ITDP