Institute for Transportation and Development Policy

Promoting sustainable and equitable transportation worldwide

  • 中文
  •  
    • Who We Are
      • ITDP China
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • 0ther Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
      BRT Database > 
    • Ahmedabad
    • Amsterdam
    • Bangkok
    • Beijing
    • Bogota
    • Brisbane
    • Bunous Aires
    • Cali
    • Cape Town
    • Changde
    • Changzhou
    • Chengdu
    • Curitiba
    • Dalian
    • Fuzhou
    • Guangzhou
    • Guayaquil
    • Guiyang
    • Hangzhou
    • Hefei
    • Islamabad
    • Istanbul
    • Jakarta
    • Jinan
    • Johannesburg
    • Kuala Lumpur
    • Lanzhou
    • Leon
    • Lianyungang
    • Lima
    • Los Angeles
    • Mexico City
    • Nagoya
    • Nanning
    • Nantes
    • Paris
    • Pune
    • Quito
    • Seoul
    • Shaoxing
    • Urumqi
    • Utrecht
    • Wenzhou
    • Wuhan
    • Xiamen
    • Yancheng
    • Yichang
    • Yinchuan
    • Yongzhou
    • Zaozhuang
    • Zhengzhou
    • Zhongshan
    • Zhoushan
     > Pune : [Updated Time( 2015-12-15)]
    • BRT Basics:
    • Segregated busways or bus-only roadways:
    • Pre-board fare collection and fare verification:
    • Level boarding and alighting:
    • Signal priority or grade separation at intersections:
    • Year system commenced:
        2015  
    • Total length of dedicated busway:
        22.7 km  
    • Location of busway lanes:
        Centre of roadway  
    • Number of BRT terminals:
        2  
    • Operation and Service:
    • Network of routes and corridors:
    • High peak period operational speed (>20km/hr):
    • Most bus passengers in BRT corridors carried by BRT buses:
    • Net time saving for bus passengers in corridor:
    • Throughput >10,000 passengers/hr (one direction):
    • Throughput >20,000 passengers/hr (one direction):
    • Payment per bus-kilometre rather than per passenger:
    • Buses operating both in & out of BRT corridors:
    • Competitively bid operating contracts:
    • More than one BRT bus operator:
    • No operational subsidy from government:
    • Independently operated fare collection system:
    • Oversight from an independent entity/agency:
    • System control centre:
    • BRT authority plans and controls the system:
      [PMPML is a govt organization]
    • Number of corridors:
        2  
    • Routes operating both inside & outside BRT roads:
        17  
    • Routes operating only in busway corridors:
        0  
    • Median cash fare:
        15 INR  
    • BRT bus operator(s):
        Travel Time, Mahalakshmi, BVG India   [Private operators contracted by PMPML]
    • BRT management agency:
        Pune Mahanagar Parivahan Mahamandal Limited (PMPML)  
    • Operational mode:
        hybrid  
    • Fare type (flat fare or distance-based):
        distance-based  
    • Type of fare collection / verification technology:
        paper ticket  
    • Stations:
    • Sliding doors in BRT stations:
    • Station size based on passenger demand:
    • Full weather protection on most station platforms:
    • Full weather protection on all station platforms:
    • Covered station access:
    • >1 substop at >75% of stations (requires overtaking):
    • >1 stop position at stopping area at >75% of stations:
    • Real-time CCTV surveillance at all stations:
    • Number of BRT stations:
        25  
    • Average distance between stations:
        990m  
    • Location of bus doorways:
        Both sides   [traffic is on the left]
    • Station platform height:
        88cm  
    • Longest BRT station (non terminal):
        36.4m  
    • Shortest BRT station:
        30m  
    • Most station substops:
        1  
    • Infrastructure:
    • Enhanced station (more than just a bus shelter):
    • Overtaking lanes at more than 75% of stations:
    • Includes BRT-only tunnels or bridges:
    • Low-emission vehicle technology (≥Euro III):
    • Automated fare collection and fare verification:
    • Stations away from intersections:
    • Stations with functioning passing lanes:
        0  
    • Number of BRT depots:
        4  
    • Communications:
    • Distinctive BRT buses:
    • Real-time next bus information displays:
    • Distinctive marketing identity for system:
      [Rainbow]
    • High-quality passenger information at stations:
    • High-quality passenger information on buses:
    • Audio announcements on BRT buses:
    • Distinctive BRT stations:
    • Access and Integration:
    • Bicycle parking at BRT stations:
    • Segregated bike lanes along main corridor(s):
      [Yes, but encroached upon in some areas]
    • Wheelchair accessible stations:
    • Improvements to nearby public space:
    • Bike sharing in vicinity of BRT stations:
    • Fleet of integrated BRT feeder buses:
        22  
    • BRT Vehicle:
    • High capacity BRT buses:
    • Fleet of special BRT buses:
        120  
    • Number of doors in BRT buses:
        4  
    • BRT vehicle length:
        12m  
    • No. of seats in 12m BRT buses:
        32  
    • BRT vehicle fuel:
        CNG  
    • BRT bus manufacturer:
        Tata, Ashok Layland  
    • Lead local design / planning work:
        ITDP, UMTC  
    • Lead international design / planning work:
        ITDP  
    • Project website:
        Rainbow BRTS  
    • Others:
    • Buses paid for by operators rather than government:
    • Preliminary planning and design costs:
        ~280 crore INR  
    • Infrastructure cost per km:
        13 crore INR   [2015 value]
    • Major prizes:
        Volvo Sustainable Mobility Award 2015-Outstanding achievement  
  •  No
     Yes
     Partial
    • Who We Are
      • ITDP-CHINA
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • Other Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
    • 11th Floor, Zhujiang Planning Building Jianshe Dama Lu, Guangzhou, China. 510060
    • phone: (86-20) 83860931
    • Rm 43, 8/F, Beijing International Hotel, #9 Jianguomennei Avenue, Beijing, China. 100001
    • phone: (86-10) 85323451
    • chinaoffice@itdp.org
    © 2016 ITDP