Institute for Transportation and Development Policy

Promoting sustainable and equitable transportation worldwide

  • 中文
  •  
    • Who We Are
      • ITDP China
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • 0ther Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
      BRT Database > 
    • Ahmedabad
    • Amsterdam
    • Bangkok
    • Beijing
    • Bogota
    • Brisbane
    • Bunous Aires
    • Cali
    • Cape Town
    • Changde
    • Changzhou
    • Chengdu
    • Curitiba
    • Dalian
    • Fuzhou
    • Guangzhou
    • Guayaquil
    • Guiyang
    • Hangzhou
    • Hefei
    • Islamabad
    • Istanbul
    • Jakarta
    • Jinan
    • Johannesburg
    • Kuala Lumpur
    • Lanzhou
    • Leon
    • Lianyungang
    • Lima
    • Los Angeles
    • Mexico City
    • Nagoya
    • Nanning
    • Nantes
    • Paris
    • Pune
    • Quito
    • Seoul
    • Shaoxing
    • Urumqi
    • Utrecht
    • Wenzhou
    • Wuhan
    • Xiamen
    • Yancheng
    • Yichang
    • Yinchuan
    • Yongzhou
    • Zaozhuang
    • Zhengzhou
    • Zhongshan
    • Zhoushan
     > Chengdu : [Updated Time( 2020-02-21)]
    • BRT Basics:
    • Segregated busways or bus-only roadways:
    • Pre-board fare collection and fare verification:
    • Level boarding and alighting:
    • Signal priority or grade separation at intersections:
    • Year system commenced:
        2013   [2rd ring road corridor opened 11 June (trial operation from 31 May); Shenxianshu connection opened on 20 Sep.2018; Fenghuangshan corridor opened on 21 Sep. 2018; Riyue Ave. corridor opened on 12 Apr. 2019.]
    • Peak throughput (passengers/hr/direction):
        9,320   [25-Nov-2015, South of Hongpailou Dong,AM peak,north-south]
      5833(2019年5月8日,成都二环高架BRT晚高峰,外环方向) 6787(2019年5月8日,成都二环高架BRT晚高峰,内环方向)
    • City centre peak hour speed:
        30 km/hr   [24&25-Nov-2015,Multiple AM & PM surveys]
    • Peak city centre buses/hr/direction:
        101   [25-Nov-15, Hongpailou Dong, AM peak, north-south]
    • Total length of dedicated busway:
        46.3 km  
    • Length including mixed traffic portions:
        46.3 km  
    • Location of busway lanes:
        Centre of roadway on elevated road  
    • Number of BRT terminals:
        1  
    • System name:
        CDBRT  
    • Operation and Service:
    • Network of routes and corridors:
    • High peak period operational speed (>20km/hr):
    • Most bus passengers in BRT corridors carried by BRT buses:
    • Net time saving for bus passengers in corridor:
    • Throughput >10,000 passengers/hr (one direction):
    • Throughput >20,000 passengers/hr (one direction):
    • Carries more than a mixed traffic lane (3000 pphpd):
    • Payment per bus-kilometre rather than per passenger:
    • Buses operating both in & out of BRT corridors:
    • Competitively bid operating contracts:
    • More than one BRT bus operator:
    • No operational subsidy from government:
      [subsidy needed]
    • Independently operated fare collection system:
    • System control centre:
    • BRT authority plans and controls the system:
    • BRT system coverage (2-way roads) (1 fare):
        46.3 km   [28.8 km for 2rd ring road corridor; 4 km for Shenxianshu connection; 8.7 km for Fenghuangshan corridor; 4.8 km for Riyue Ave. corridor]
    • Number of corridors:
        3   [2rd ring road corridor is circular corridor]
    • Routes operating both inside & outside BRT roads:
        8   [K3, K5, K11, K11A, K12, K13, K15, K16]
    • Routes operating only in busway corridors:
        4   [K1, K2, K1A, K2A]
    • Highest peak hour boardings at a single station:
        1,660   [31-Jul-2013, Hongpailoudong station, PM peak]
    • Median cash fare:
        2 yuan   [3 yuan after 10pm]
    • Median smart card fare:
        1.8 yuan   [2.7 after 10pm; monthly pass: 1 yuan and 3 times free transfer in 2 hrs]
    • BRT bus operator(s):
        Chengdu Public Transport Group CO., LTD  
    • BRT management agency:
        Chengdu Public Transport Group  
    • Operational mode:
        trunk-feeder  
    • Average bus occupancy (peak hour, direction & point):
        93  
    • Fare type (flat fare or distance-based):
        flat fare   [Distance based set-up, though, with exit verification]
    • Type of fare collection / verification technology:
        Card, token  
    • Operating hours:
        5:50am-11.48pm   [K1: 6:18-23:48, K2:5:50-23:08, K1A/K2A:7:00-19:00, K2A:7:00-19:00K2:5:50-23:08K1A/K2A:7:00-19:00)K2A:7:00-19:00]
    • Fleet of regular buses using BRT stations:
        0  
    • Stations:
    • Sliding doors in BRT stations:
    • Station size based on passenger demand:
    • Full weather protection on most station platforms:
    • Full weather protection on all station platforms:
    • Covered station access:
      [Station access bridges are not covered]
    • Escalators/lifts at >20% of stations with bridges/tunnels:
    • >1 substop at >75% of stations (requires overtaking):
    • >1 stop position at stopping area at >75% of stations:
      [4 station doors can accommodate 2 18m buses]
    • Real-time CCTV surveillance at all stations:
    • Number of BRT stations:
        44   [28 for 2rd ring road corridor; 3 for Shenxianshu connection; 7 for Fenghuangshan corridor; 6 for Riyue Ave. corridor]
    • Average distance between stations:
        1,050m  
    • Location of bus doorways:
        Both sides   [traffic is on the right]
    • Station platform height:
        35cm  
    • Longest BRT station (non terminal):
        161m  
    • Shortest BRT station:
        73m  
    • Most station substops:
        1  
    • Number of turnstiles/gates per entry (median):
        5  
    • Station platform width (including walls & doors):
        5m  
    • Infrastructure:
    • Enhanced station (more than just a bus shelter):
    • Overtaking lanes at more than 75% of stations:
    • Includes BRT-only tunnels or bridges:
    • Low-emission vehicle technology (≥Euro III):
    • Automated fare collection and fare verification:
    • Stations away from intersections:
    • Physical BRT laneway dividers:
    • Stations with functioning passing lanes:
        0  
    • Number of BRT depots:
        2  
    • Fare system vendor:
        Jiangsu Huimin  
    • Sliding door system vendor:
        Jiangsu Huimin  
    • Communications:
    • Distinctive BRT buses:
    • Real-time next bus information displays:
    • Distinctive marketing identity for system:
    • High-quality passenger information at stations:
    • High-quality passenger information on buses:
    • Audio announcements on BRT buses:
    • Distinctive BRT stations:
    • Access and Integration:
    • Bicycle parking at BRT stations:
      [Despite huge bicycle volumes]
    • Segregated bike lanes along main corridor(s):
    • Wheelchair accessible stations:
    • Improvements to nearby public space:
      [Massively degraded via elevated road]
    • Bike sharing in vicinity of BRT stations:
    • Fleet of integrated BRT feeder buses:
        0  
    • BRT Vehicle:
    • High capacity BRT buses:
    • Fleet of special BRT buses:
        232   [164 initially, increased to 232 in 2015. 18m buses]
    • Number of doors in BRT buses:
        5   [2 left side, 3 right side; stations use left side]
    • BRT vehicle length:
        18m  
    • No. of seats in 18m BRT buses:
        38  
    • BRT vehicle fuel:
        CNG  
    • BRT bus manufacturer:
        Shudu  
    • Lead local design / planning work:
        Chengdu Municipal Engineering Design Research Institute  
    • Fleet of 18m or larger BRT buses:
        232  
    • Others:
    • BRT Standard score (GOLD, SILVER, BRONZE):
        SILVER  
  •  No
     Yes
     Partial
    • Who We Are
      • ITDP-CHINA
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • Other Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
    • 11th Floor, Zhujiang Planning Building Jianshe Dama Lu, Guangzhou, China. 510060
    • phone: (86-20) 83860931
    • Rm 43, 8/F, Beijing International Hotel, #9 Jianguomennei Avenue, Beijing, China. 100001
    • phone: (86-10) 85323451
    • chinaoffice@itdp.org
    © 2016 ITDP