Institute for Transportation and Development Policy

Promoting sustainable and equitable transportation worldwide

  • 中文
  •  
    • Who We Are
      • ITDP China
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • 0ther Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
      BRT Database > 
    • Ahmedabad
    • Amsterdam
    • Bangkok
    • Beijing
    • Bogota
    • Brisbane
    • Bunous Aires
    • Cali
    • Cape Town
    • Changde
    • Changzhou
    • Chengdu
    • Curitiba
    • Dalian
    • Fuzhou
    • Guangzhou
    • Guayaquil
    • Guiyang
    • Hangzhou
    • Hefei
    • Islamabad
    • Istanbul
    • Jakarta
    • Jinan
    • Johannesburg
    • Kuala Lumpur
    • Lanzhou
    • Leon
    • Lianyungang
    • Lima
    • Los Angeles
    • Mexico City
    • Nagoya
    • Nanning
    • Nantes
    • Paris
    • Pune
    • Quito
    • Seoul
    • Shaoxing
    • Urumqi
    • Utrecht
    • Wenzhou
    • Wuhan
    • Xiamen
    • Yancheng
    • Yichang
    • Yinchuan
    • Yongzhou
    • Zaozhuang
    • Zhengzhou
    • Zhongshan
    • Zhoushan
     > Fuzhou : [Updated Time( 2020-03-02)]
    • BRT Basics:
    • Segregated busways or bus-only roadways:
    • Pre-board fare collection and fare verification:
    • Level boarding and alighting:
    • Year system commenced:
        2019   [24 March 2019, phase 1 opened (Huanchengbeilu to Yingbin Ave.)]
    • Total length of dedicated busway:
        5.5  
    • Location of busway lanes:
        Centre of roadway  
    • Number of BRT terminals:
        1   [Railway Station]
    • Operation and Service:
    • Network of routes and corridors:
    • More than one BRT bus operator:
    • Number of corridors:
        1  
    • Routes operating both inside & outside BRT roads:
        9   [B1, B2, B7, B9, B11, B31, B33, B36, BG1]
    • Routes operating only in busway corridors:
        0  
    • Median cash fare:
        2 yuan  
    • BRT bus operator(s):
        Fuzhou Public Transport Co.Ltd.  
    • Fare type (flat fare or distance-based):
        flat fare  
    • Operating hours:
        6:30am-9:30pm  
    • Stations:
    • Sliding doors in BRT stations:
    • Full weather protection on most station platforms:
    • Covered station access:
    • Number of BRT stations:
        10  
    • Average distance between stations:
        550 m  
    • Location of bus doorways:
        Both sides  
    • Station platform height:
        35 cm  
    • Most station substops:
        1  
    • Number of turnstiles/gates per entry (median):
        5  
    • Infrastructure:
    • Enhanced station (more than just a bus shelter):
    • Overtaking lanes at more than 75% of stations:
    • Includes BRT-only tunnels or bridges:
    • Automated fare collection and fare verification:
    • Stations away from intersections:
    • Physical BRT laneway dividers:
    • Communications:
    • Distinctive BRT buses:
    • Real-time next bus information displays:
    • Access and Integration:
    • Bicycle parking at BRT stations:
    • Segregated bike lanes along main corridor(s):
    • BRT Vehicle:
    • Fleet of special BRT buses:
        134  
    • Number of doors in BRT buses:
        3   [2 on right side, 1 on left side]
    • BRT vehicle length:
        10.5 m  
    • Others:
    • Urban area inhabitants:
        405   [data in 2018]
  •  No
     Yes
     Partial
    • Who We Are
      • ITDP-CHINA
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • Other Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
    • 11th Floor, Zhujiang Planning Building Jianshe Dama Lu, Guangzhou, China. 510060
    • phone: (86-20) 83860931
    • Rm 43, 8/F, Beijing International Hotel, #9 Jianguomennei Avenue, Beijing, China. 100001
    • phone: (86-10) 85323451
    • chinaoffice@itdp.org
    © 2016 ITDP