Institute for Transportation and Development Policy

Promoting sustainable and equitable transportation worldwide

  • 中文
  •  
    • Who We Are
      • ITDP China
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • 0ther Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
      BRT Database > 
    • Ahmedabad
    • Amsterdam
    • Bangkok
    • Beijing
    • Bogota
    • Brisbane
    • Bunous Aires
    • Cali
    • Cape Town
    • Changde
    • Changzhou
    • Chengdu
    • Curitiba
    • Dalian
    • Fuzhou
    • Guangzhou
    • Guayaquil
    • Guiyang
    • Hangzhou
    • Hefei
    • Islamabad
    • Istanbul
    • Jakarta
    • Jinan
    • Johannesburg
    • Kuala Lumpur
    • Lanzhou
    • Leon
    • Lianyungang
    • Lima
    • Los Angeles
    • Mexico City
    • Nagoya
    • Nanning
    • Nantes
    • Paris
    • Pune
    • Quito
    • Seoul
    • Shaoxing
    • Urumqi
    • Utrecht
    • Wenzhou
    • Wuhan
    • Xiamen
    • Yancheng
    • Yichang
    • Yinchuan
    • Yongzhou
    • Zaozhuang
    • Zhengzhou
    • Zhongshan
    • Zhoushan
     > Xiamen : [Updated Time( 2018-02-26)]
    • BRT Basics:
    • Segregated busways or bus-only roadways:
    • Pre-board fare collection and fare verification:
    • Level boarding and alighting:
      [level but sometimes large gap]
    • Signal priority or grade separation at intersections:
    • Year system commenced:
        2008   [Opened 1 September 2008, Corridor 2 (Binhai XC to Tong'an) opened 2 July 2010]
    • Peak throughput (passengers/hr/direction):
        9,587   [20-Dec-2017, East of Wolong Xiaocheng, AM peak, east-west]
    • City centre peak hour speed:
        31.6 km/hr   [18-Dec-2017,AM peak]
    • Peak city centre buses/hr/direction:
        93   [20-Dec-2017, East of Wolong Xiaocheng, AM peak, east-west]
    • Total length of dedicated busway:
        52.04 km  
    • Length including mixed traffic portions:
        53.18 km  
    • Location of busway lanes:
        Elevated busway   [bus-only elevated road; some at-grade median aligned]
    • Number of BRT terminals:
        4   [Diyi Matou, Qianpu Shuniuzhan, Xiamen Beizhan, Tong'an Shuniuzhan]
    • System name:
        Xiamen BRT  
    • Operation and Service:
    • Network of routes and corridors:
    • High peak period operational speed (>20km/hr):
    • Most bus passengers in BRT corridors carried by BRT buses:
    • Net time saving for bus passengers in corridor:
    • Throughput >10,000 passengers/hr (one direction):
    • Throughput >20,000 passengers/hr (one direction):
    • Carries more than a mixed traffic lane (3000 pphpd):
    • Payment per bus-kilometre rather than per passenger:
    • Buses operating both in & out of BRT corridors:
    • Competitively bid operating contracts:
    • More than one BRT bus operator:
    • No operational subsidy from government:
      [subsidy needed]
    • System control centre:
    • Number of corridors:
        3  
    • Routes operating both inside & outside BRT roads:
        0  
    • Routes operating only in busway corridors:
        6   [K1,K2, K3, K5, K6, K7]
    • Median cash fare:
        1 - 4 yuan   [0.15 yuan/km, min. 1 yuan, max. 4 yuan]
    • Median smart card fare:
        0 - 3.6 yuan   [card 10% discount; student card 50% discount; model worker, Martyr's dependents, soldier, older free; children under 1.2 m free]
    • BRT management agency:
        Xiamen BRT Operation Company and Xiamen BRT Plaza-station Company  
    • Operational mode:
        trunk-only   [has feeder routes, but not strongly integrated]
    • Average bus occupancy (peak hour, direction & point):
        103  
    • Fare type (flat fare or distance-based):
        distance-based   [0.1 yuan/km, min 0.5 yuan, max 5 yuan]
    • Type of fare collection / verification technology:
        Card, token  
    • Operating hours:
        5:45am-10:50pm  
    • Fleet of regular buses using BRT stations:
        0  
    • Stations:
    • Sliding doors in BRT stations:
    • Station size based on passenger demand:
    • Full weather protection on most station platforms:
    • Full weather protection on all station platforms:
    • Covered station access:
    • Escalators/lifts at >20% of stations with bridges/tunnels:
    • >1 substop at >75% of stations (requires overtaking):
    • >1 stop position at stopping area at >75% of stations:
    • Number of BRT stations:
        42   [3 more will be used in 2018]
    • Average distance between stations:
        1,300m   [915m in e-w section]
    • Location of bus doorways:
        Right side   [traffic is on the right]
    • Station platform height:
        35cm  
    • Longest BRT station (non terminal):
        68m  
    • Shortest BRT station:
        40m  
    • Most station substops:
        1  
    • Number of turnstiles/gates per entry (median):
        3  
    • Infrastructure:
    • Enhanced station (more than just a bus shelter):
    • Overtaking lanes at more than 75% of stations:
    • Includes BRT-only tunnels or bridges:
      [Including a tunnel and very long bridge]
    • Automated fare collection and fare verification:
    • Stations away from intersections:
    • Stations with functioning passing lanes:
        5%   [2 stations]
    • Number of BRT depots:
        4   [One at the end of each corridor]
    • Fare system vendor:
        Jiangsu Huimin  
    • Sliding door system vendor:
        Jiangsu Huimin  
    • Surveillance system vendor:
        Qingdao Hisense  
    • Communications:
    • Distinctive BRT buses:
    • Real-time next bus information displays:
    • Distinctive marketing identity for system:
      [Xiamen BRT]
    • High-quality passenger information at stations:
    • High-quality passenger information on buses:
    • Audio announcements on BRT buses:
    • Distinctive BRT stations:
    • Access and Integration:
    • Bicycle parking at BRT stations:
      [Despite huge bicycle volumes]
    • Segregated bike lanes along main corridor(s):
      [Bikes are banned along Xiahe Rd corridor]
    • Wheelchair accessible stations:
    • Improvements to nearby public space:
      [Riverside improvements on Xike corridor]
    • Bike sharing in vicinity of BRT stations:
    • BRT Vehicle:
    • High capacity BRT buses:
      [18m buses introduced from 24 April 2010]
    • Fleet of special BRT buses:
        307   [Includes 82 18m buses as of June 2013]
    • Number of doors in BRT buses:
        2   [3 in the 18m buses]
    • BRT vehicle length:
        10m, 12m, 18m   [12m trunk, 10m feeder. 6 18m BRT buses introduced 24 April 2010. 6 more on 1 May]
    • No. of seats in 12m BRT buses:
        35  
    • BRT vehicle fuel:
        diesel  
    • BRT bus manufacturer:
        Kinglong   [Kinglong is based in Xiamen]
    • Fleet of 18m or larger BRT buses:
        82   [as of June 2013]
    • Others:
    • Buses paid for by operators rather than government:
    • Infrastructure cost per km:
        10 billion yuan for 48.9km   [2008 value. Baidu Baike. ~35km elevated]
    • BRT Standard score (GOLD, SILVER, BRONZE):
        SILVER  
  •  No
     Yes
     Partial
    • Who We Are
      • ITDP-CHINA
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • Other Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
    • 11th Floor, Zhujiang Planning Building Jianshe Dama Lu, Guangzhou, China. 510060
    • phone: (86-20) 83860931
    • Rm 43, 8/F, Beijing International Hotel, #9 Jianguomennei Avenue, Beijing, China. 100001
    • phone: (86-10) 85323451
    • chinaoffice@itdp.org
    © 2016 ITDP