Institute for Transportation and Development Policy

Promoting sustainable and equitable transportation worldwide

  • 中文
  •  
    • Who We Are
      • ITDP China
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • 0ther Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
      BRT Database > 
    • Ahmedabad
    • Amsterdam
    • Bangkok
    • Beijing
    • Bogota
    • Brisbane
    • Bunous Aires
    • Cali
    • Cape Town
    • Changde
    • Changzhou
    • Chengdu
    • Curitiba
    • Dalian
    • Fuzhou
    • Guangzhou
    • Guayaquil
    • Guiyang
    • Hangzhou
    • Hefei
    • Islamabad
    • Istanbul
    • Jakarta
    • Jinan
    • Johannesburg
    • Kuala Lumpur
    • Lanzhou
    • Leon
    • Lianyungang
    • Lima
    • Los Angeles
    • Mexico City
    • Nagoya
    • Nanning
    • Nantes
    • Paris
    • Pune
    • Quito
    • Seoul
    • Shaoxing
    • Urumqi
    • Utrecht
    • Wenzhou
    • Wuhan
    • Xiamen
    • Yancheng
    • Yichang
    • Yinchuan
    • Yongzhou
    • Zaozhuang
    • Zhengzhou
    • Zhongshan
    • Zhoushan
     > Yinchuan : [Updated Time( 2015-11-28)]
    • BRT Basics:
    • Segregated busways or bus-only roadways:
    • Pre-board fare collection and fare verification:
    • Level boarding and alighting:
    • Signal priority or grade separation at intersections:
    • Year system commenced:
        2012   [Opened 10 September]
    • Peak throughput (passengers/hr/direction):
        2,770   [25-Nov-2015, West of Shangchengs stn, PM peak, east-west]
    • City centre peak hour speed:
        17.2 km/hr   [25&26-Nov-2015, Multiple surveys]
    • Peak city centre buses/hr/direction:
        44   [25-Dec-2015, Shangchengs stn, PM peak, east-west]
    • Total length of dedicated busway:
        21 km  
    • Length including mixed traffic portions:
        17 km  
    • Location of busway lanes:
        Centre of roadway  
    • Number of BRT terminals:
        2   [Yinchuanxizhan, Qichezhan]
    • Operation and Service:
    • Network of routes and corridors:
    • High peak period operational speed (>20km/hr):
    • Most bus passengers in BRT corridors carried by BRT buses:
    • Net time saving for bus passengers in corridor:
      [Likely, in some parts of the corridor]
    • Throughput >10,000 passengers/hr (one direction):
    • Throughput >20,000 passengers/hr (one direction):
    • Carries more than a mixed traffic lane (3000 pphpd):
    • Buses operating both in & out of BRT corridors:
    • More than one BRT bus operator:
    • No operational subsidy from government:
      [subsidy needed]
    • Oversight from an independent entity/agency:
    • System control centre:
    • BRT authority plans and controls the system:
    • Number of corridors:
        1  
    • Routes operating both inside & outside BRT roads:
        10   [1,9,31,53,101,102,105,106,508,night bus]
    • Routes operating only in busway corridors:
        1   [B1]
    • Highest peak hour boardings at a single station:
        1,000   [26-Sep-2012, Shangcheng BRT station, Nanxundongjie, PM peak]
    • Median cash fare:
        1 yuan  
    • Median smart card fare:
        0.9 yuan   [0.9 yuan in peak, 0.7 in off peak hours]
    • BRT bus operator(s):
        Yinchuan Bus Co.  
    • Operational mode:
        direct-service  
    • Average bus occupancy (peak hour, direction & point):
        64  
    • Fare type (flat fare or distance-based):
        flat fare  
    • Type of fare collection / verification technology:
        Card, cash  
    • Operating hours:
        6:30am-10:00pm  
    • Stations:
    • Sliding doors in BRT stations:
    • Station size based on passenger demand:
      [Yes (55m and 80m), but not properly functioning]
    • Full weather protection on most station platforms:
    • Full weather protection on all station platforms:
    • Covered station access:
    • Escalators/lifts at >20% of stations with bridges/tunnels:
    • >1 substop at >75% of stations (requires overtaking):
    • >1 stop position at stopping area at >75% of stations:
    • Real-time CCTV surveillance at all stations:
    • Number of BRT stations:
        22  
    • Average distance between stations:
        800m  
    • Location of bus doorways:
        Right side   [traffic is on the right]
    • Station platform height:
        35cm  
    • Shortest BRT station:
        ~55m  
    • Most station substops:
        1  
    • Number of turnstiles/gates per entry (median):
        4  
    • Station platform width (including walls & doors):
        3m  
    • Infrastructure:
    • Enhanced station (more than just a bus shelter):
    • Overtaking lanes at more than 75% of stations:
    • Includes BRT-only tunnels or bridges:
    • Low-emission vehicle technology (≥Euro III):
      [CNG, Euro IV]
    • Automated fare collection and fare verification:
    • Stations away from intersections:
    • Stations with functioning passing lanes:
        0  
    • Number of BRT depots:
        1  
    • Fare system vendor:
        Jiangsu Huimin  
    • Sliding door system vendor:
        Jiangsu Huimin  
    • Surveillance system vendor:
        Qingdao Hisense  
    • Communications:
    • Distinctive BRT buses:
    • Real-time next bus information displays:
    • Distinctive marketing identity for system:
    • High-quality passenger information at stations:
    • High-quality passenger information on buses:
    • Audio announcements on BRT buses:
    • Distinctive BRT stations:
    • Access and Integration:
    • Bicycle parking at BRT stations:
    • Segregated bike lanes along main corridor(s):
      [Yes, except for except Nanxun Dong Jie]
    • Wheelchair accessible stations:
    • Bike sharing in vicinity of BRT stations:
    • BRT Vehicle:
    • High capacity BRT buses:
    • Fleet of special BRT buses:
        80   [20 12m, 60 18m buses]
    • Number of doors in BRT buses:
        3   [2 in the 12m buses]
    • BRT vehicle length:
        12m, 18m  
    • No. of seats in 12m BRT buses:
        29  
    • No. of seats in 18m BRT buses:
        41  
    • BRT vehicle fuel:
        CNG  
    • BRT bus manufacturer:
        Youngman, Huanghai, Foton  
    • Project website:
        Yinchuan Bus Co  
    • Fleet of 18m or larger BRT buses:
        60  
    • Others:
    • Infrastructure cost per km:
        420m yuan for 21km   [2012 value. Total cost source: Baidu Baike]
    • BRT Standard score (GOLD, SILVER, BRONZE):
        BRONZE  
  •  No
     Yes
     Partial
    • Who We Are
      • ITDP-CHINA
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • Other Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
    • 11th Floor, Zhujiang Planning Building Jianshe Dama Lu, Guangzhou, China. 510060
    • phone: (86-20) 83860931
    • Rm 43, 8/F, Beijing International Hotel, #9 Jianguomennei Avenue, Beijing, China. 100001
    • phone: (86-10) 85323451
    • chinaoffice@itdp.org
    © 2016 ITDP