Institute for Transportation and Development Policy

Promoting sustainable and equitable transportation worldwide

  • 中文
  •  
    • Who We Are
      • ITDP China
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • 0ther Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
      BRT Database > 
    • Ahmedabad
    • Amsterdam
    • Bangkok
    • Beijing
    • Bogota
    • Brisbane
    • Bunous Aires
    • Cali
    • Cape Town
    • Changde
    • Changzhou
    • Chengdu
    • Curitiba
    • Dalian
    • Fuzhou
    • Guangzhou
    • Guayaquil
    • Guiyang
    • Hangzhou
    • Hefei
    • Islamabad
    • Istanbul
    • Jakarta
    • Jinan
    • Johannesburg
    • Kuala Lumpur
    • Lanzhou
    • Leon
    • Lianyungang
    • Lima
    • Los Angeles
    • Mexico City
    • Nagoya
    • Nanning
    • Nantes
    • Paris
    • Pune
    • Quito
    • Seoul
    • Shaoxing
    • Urumqi
    • Utrecht
    • Wenzhou
    • Wuhan
    • Xiamen
    • Yancheng
    • Yichang
    • Yinchuan
    • Yongzhou
    • Zaozhuang
    • Zhengzhou
    • Zhongshan
    • Zhoushan
     > Ahmedabad : [Updated Time( 2012-09-15)]
    • BRT Basics:
    • Segregated busways or bus-only roadways:
      [Segregation continues at flyovers, which are split]
    • Pre-board fare collection and fare verification:
    • Level boarding and alighting:
    • Signal priority or grade separation at intersections:
    • Year system commenced:
        2009   [Testing in July (no fare). Full operation 15-Oct-09 first 12km. 27km opened in 2010]
    • Peak throughput (passengers/hr/direction):
        1,200   [7-Sep-12,Juna Vadaj BRT station, PM peak]
    • Peak city centre buses/hr/direction:
        20  
    • Total length of dedicated busway:
        38 km  
    • Length including mixed traffic portions:
        39 km  
    • Location of busway lanes:
        Centre of roadway  
    • Number of BRT terminals:
        0   [2 under construction]
    • System name:
        Janmarg  
    • Operation and Service:
    • Network of routes and corridors:
    • High peak period operational speed (>20km/hr):
    • Most bus passengers in BRT corridors carried by BRT buses:
    • Net time saving for bus passengers in corridor:
    • Throughput >10,000 passengers/hr (one direction):
    • Throughput >20,000 passengers/hr (one direction):
    • Carries more than a mixed traffic lane (3000 pphpd):
    • Buses operating both in & out of BRT corridors:
      [Though buses have doors in both sides, permitting off-corridor operation]
    • Competitively bid operating contracts:
      [Bus contracting based on km operated. Bus operator no role or share in fare collection.]
    • More than one BRT bus operator:
    • No operational subsidy from government:
      [subsidy needed]
    • Oversight from an independent entity/agency:
      [Company set up by city government to oversee operations]
    • System control centre:
      [For fleet management as well as fare collection and revenue management]
    • BRT authority plans and controls the system:
    • BRT system coverage (2-way roads) (1 fare):
        39 km  
    • Number of corridors:
        4  
    • Routes operating both inside & outside BRT roads:
        0  
    • Routes operating only in busway corridors:
        4  
    • System passenger-trips per day:
        115,000   [Source: ITDP, June-2011]
    • Median cash fare:
        Rs 2-11   [Distanced-based fare, Rs 2-11 (0.3-1.6 yuan)]
    • Median smart card fare:
        Rs 2-11   [Yet to start, planned same as cash fare]
    • BRT management agency:
        Ahmedabad Janmarg Limited  
    • Operational mode:
        trunk-only  
    • Average bus occupancy (peak hour, direction & point):
        60  
    • Fare type (flat fare or distance-based):
        distance-based  
    • Operating hours:
        6:00am-11:30pm  
    • Fleet of regular buses using BRT stations:
        0  
    • Stations:
    • Sliding doors in BRT stations:
    • Station size based on passenger demand:
    • Full weather protection on most station platforms:
    • Full weather protection on all station platforms:
    • Covered station access:
    • >1 substop at >75% of stations (requires overtaking):
    • >1 stop position at stopping area at >75% of stations:
    • Number of BRT stations:
        76   [Stations updated to Aug-2013; other data Sep-2012]
    • Average distance between stations:
        700m  
    • Location of bus doorways:
        Both sides   [traffic is on the left]
    • Station platform height:
        90cm  
    • Longest BRT station (non terminal):
        35m  
    • Shortest BRT station:
        13m  
    • Most station substops:
        1  
    • Infrastructure:
    • Enhanced station (more than just a bus shelter):
    • Overtaking lanes at more than 75% of stations:
    • Includes BRT-only tunnels or bridges:
      [Flyovers were split to accommodate central BRT]
    • Low-emission vehicle technology (≥Euro III):
      [Euro III diesel buses]
    • Automated fare collection and fare verification:
      [Currently paper-based]
    • Physical BRT laneway dividers:
    • Stations with functioning passing lanes:
        0  
    • Number of BRT depots:
        0   [1 under construction]
    • Communications:
    • Distinctive BRT buses:
    • Real-time next bus information displays:
    • Distinctive marketing identity for system:
      [Janmarg]
    • High-quality passenger information at stations:
    • Audio announcements at stations:
    • High-quality passenger information on buses:
    • Audio announcements on BRT buses:
    • Distinctive BRT stations:
    • Access and Integration:
    • Bicycle parking at BRT stations:
    • Segregated bike lanes along main corridor(s):
      [Yes, but bike lanes are discontinuous and not used]
    • Wheelchair accessible stations:
      [In planning yes, but bollards prevent access]
    • Improvements to nearby public space:
    • Bike sharing in vicinity of BRT stations:
    • Fleet of integrated BRT feeder buses:
        0  
    • BRT Vehicle:
    • High capacity BRT buses:
      [Special 12m, 90 person BRT buses]
    • Fleet of special BRT buses:
        70  
    • Number of doors in BRT buses:
        1   [one in both sides of the buses, 1.96m wide]
    • BRT vehicle length:
        12m  
    • No. of seats in 12m BRT buses:
        35  
    • BRT vehicle fuel:
        diesel, CNG  
    • BRT bus manufacturer:
        Tata  
    • Lead local design / planning work:
        CEPT University  
    • Lead international design / planning work:
        ITDP  
    • Project website:
        Janmarg  
    • Fleet of 18m or larger BRT buses:
        0  
    • Others:
    • Buses paid for by operators rather than government:
    • Preliminary planning and design costs:
        US$0.7 million   [$0.7 million, first 12.5km only]
    • Infrastructure cost per km:
        US$2.4 million   [2009 value. US$2.4m, first 12.5km only]
    • Major prizes:
        2010 Sustainable Transport Award  
    • BRT Standard score (GOLD, SILVER, BRONZE):
        BRONZE   [Narol-Noroda corridor Silver, RTO and Sola Bronze]
  •  No
     Yes
     Partial
    • Who We Are
      • ITDP-CHINA
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • Other Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
    • 11th Floor, Zhujiang Planning Building Jianshe Dama Lu, Guangzhou, China. 510060
    • phone: (86-20) 83860931
    • Rm 43, 8/F, Beijing International Hotel, #9 Jianguomennei Avenue, Beijing, China. 100001
    • phone: (86-10) 85323451
    • chinaoffice@itdp.org
    © 2016 ITDP