Institute for Transportation and Development Policy

Promoting sustainable and equitable transportation worldwide

  • 中文
  •  
    • Who We Are
      • ITDP China
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • 0ther Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
      BRT Database > 
    • Ahmedabad
    • Amsterdam
    • Bangkok
    • Beijing
    • Bogota
    • Brisbane
    • Bunous Aires
    • Cali
    • Cape Town
    • Changde
    • Changzhou
    • Chengdu
    • Curitiba
    • Dalian
    • Fuzhou
    • Guangzhou
    • Guayaquil
    • Guiyang
    • Hangzhou
    • Hefei
    • Islamabad
    • Istanbul
    • Jakarta
    • Jinan
    • Johannesburg
    • Kuala Lumpur
    • Lanzhou
    • Leon
    • Lianyungang
    • Lima
    • Los Angeles
    • Mexico City
    • Nagoya
    • Nanning
    • Nantes
    • Paris
    • Pune
    • Quito
    • Seoul
    • Shaoxing
    • Urumqi
    • Utrecht
    • Wenzhou
    • Wuhan
    • Xiamen
    • Yancheng
    • Yichang
    • Yinchuan
    • Yongzhou
    • Zaozhuang
    • Zhengzhou
    • Zhongshan
    • Zhoushan
     > Nantes : [Updated Time( 2011-07-02)]
    • BRT Basics:
    • Segregated busways or bus-only roadways:
      [The southern 2km section, around 1/3 of the line, has only 1 BRT lane]
    • Pre-board fare collection and fare verification:
      [Tickets can't be bought on bus. Cards scanned on entry/exit, tickets bought at vending machines at statio]
    • Level boarding and alighting:
    • Signal priority or grade separation at intersections:
    • Year system commenced:
        2006   [Opened 6 November]
    • Peak throughput (passengers/hr/direction):
        1,200   [24-Jun-2010,South of Cite International des Congress, AM peak, south-north]
    • City centre peak hour speed:
        19 km/hr   [24-Jun-2010,AM peak,south-north; Off-peak speed around 22km/hr]
    • Peak city centre buses/hr/direction:
        9   [24-Jun-2010, Cite International des Congress, AM peak, south-north]
    • Total length of dedicated busway:
        6.2 km  
    • Length including mixed traffic portions:
        6.6 km  
    • Location of busway lanes:
        Centre of roadway  
    • Number of BRT terminals:
        0  
    • System name:
        Bus Way  
    • Operation and Service:
    • Network of routes and corridors:
    • High peak period operational speed (>20km/hr):
    • Most bus passengers in BRT corridors carried by BRT buses:
    • Net time saving for bus passengers in corridor:
    • Throughput >10,000 passengers/hr (one direction):
    • Throughput >20,000 passengers/hr (one direction):
    • Carries more than a mixed traffic lane (3000 pphpd):
    • Payment per bus-kilometre rather than per passenger:
    • Buses operating both in & out of BRT corridors:
    • Competitively bid operating contracts:
    • More than one BRT bus operator:
    • No operational subsidy from government:
      [subsidy needed]
    • BRT system coverage (2-way roads) (1 fare):
        6.6 km  
    • Number of corridors:
        1  
    • Routes operating both inside & outside BRT roads:
        0  
    • Routes operating only in busway corridors:
        1   [Line 4]
    • BRT bus operator(s):
        TAN  
    • BRT management agency:
        Semitan   [Shareholders are Nantes Métropole (65%), transport group Transdev (14.99%), banking group Caisse d'Epargne (10%), and the Chambre de commerce et d'industrie de Nantes (10%). (Wikipedia)]
    • Operational mode:
        trunk-only  
    • Fare type (flat fare or distance-based):
        distance-based  
    • Fleet of regular buses using BRT stations:
        0  
    • Stations:
    • Sliding doors in BRT stations:
    • Station size based on passenger demand:
    • Full weather protection on most station platforms:
    • Full weather protection on all station platforms:
    • Covered station access:
    • >1 substop at >75% of stations (requires overtaking):
    • >1 stop position at stopping area at >75% of stations:
    • Number of BRT stations:
        15  
    • Average distance between stations:
        470m  
    • Location of bus doorways:
        Right side   [traffic is on the right]
    • Most station substops:
        1  
    • Infrastructure:
    • Enhanced station (more than just a bus shelter):
    • Overtaking lanes at more than 75% of stations:
    • Includes BRT-only tunnels or bridges:
    • Low-emission vehicle technology (≥Euro III):
      [CNG]
    • Automated fare collection and fare verification:
      [Also allows cash payment to driver, with change given]
    • Stations away from intersections:
    • Stations with functioning passing lanes:
        0  
    • Communications:
    • Distinctive BRT buses:
    • Real-time next bus information displays:
    • Distinctive marketing identity for system:
      [Bus Way]
    • High-quality passenger information at stations:
    • Audio announcements at stations:
    • High-quality passenger information on buses:
    • Audio announcements on BRT buses:
    • Distinctive BRT stations:
    • Access and Integration:
    • Bicycle parking at BRT stations:
    • Segregated bike lanes along main corridor(s):
    • Wheelchair accessible stations:
    • Improvements to nearby public space:
    • Bike sharing in vicinity of BRT stations:
    • Fleet of integrated BRT feeder buses:
        0  
    • BRT Vehicle:
    • High capacity BRT buses:
    • Fleet of special BRT buses:
        20  
    • Number of doors in BRT buses:
        4  
    • BRT vehicle length:
        18m  
    • BRT vehicle fuel:
        CNG  
    • BRT bus manufacturer:
        Mercedes Benz   [Mercedes-Benz Citaro G]
    • Fleet of 18m or larger BRT buses:
        20  
    • Others:
    • Buses paid for by operators rather than government:
    • Infrastructure cost per km:
        7.58m euros   [2006 value. 50m euros for the 6.6km]
    • Urban area inhabitants:
        0.6 million  
    • BRT Standard score (GOLD, SILVER, BRONZE):
        BRONZE  
  •  No
     Yes
     Partial
    • Who We Are
      • ITDP-CHINA
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • Other Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
    • 11th Floor, Zhujiang Planning Building Jianshe Dama Lu, Guangzhou, China. 510060
    • phone: (86-20) 83860931
    • Rm 43, 8/F, Beijing International Hotel, #9 Jianguomennei Avenue, Beijing, China. 100001
    • phone: (86-10) 85323451
    • chinaoffice@itdp.org
    © 2016 ITDP