Institute for Transportation and Development Policy

Promoting sustainable and equitable transportation worldwide

  • 中文
  •  
    • Who We Are
      • ITDP China
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • 0ther Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
      BRT Database > 
    • Ahmedabad
    • Amsterdam
    • Bangkok
    • Beijing
    • Bogota
    • Brisbane
    • Bunous Aires
    • Cali
    • Cape Town
    • Changde
    • Changzhou
    • Chengdu
    • Curitiba
    • Dalian
    • Fuzhou
    • Guangzhou
    • Guayaquil
    • Guiyang
    • Hangzhou
    • Hefei
    • Islamabad
    • Istanbul
    • Jakarta
    • Jinan
    • Johannesburg
    • Kuala Lumpur
    • Lanzhou
    • Leon
    • Lianyungang
    • Lima
    • Los Angeles
    • Mexico City
    • Nagoya
    • Nanning
    • Nantes
    • Paris
    • Pune
    • Quito
    • Seoul
    • Shaoxing
    • Urumqi
    • Utrecht
    • Wenzhou
    • Wuhan
    • Xiamen
    • Yancheng
    • Yichang
    • Yinchuan
    • Yongzhou
    • Zaozhuang
    • Zhengzhou
    • Zhongshan
    • Zhoushan
     > Bunous Aires : [Updated Time( 2017-09-17)]
    • BRT Basics:
    • Segregated busways or bus-only roadways:
    • Pre-board fare collection and fare verification:
    • Signal priority or grade separation at intersections:
    • Level boarding and alighting:
    • Peak throughput (passengers/hr/direction):
        8528   [3-Jul-17, north of C.T.Pacifico-Avenida Santa Fe 4400 W,AM Peak, West-East]
    • Peak city centre buses/hr/direction:
        193   [4-Jul-17,north of AvenidaLeandroN.Alem 302-322 S,AM Peak, North-South]
    • Year system commenced:
        2011  
    • System name:
        Metrobus  
    • City centre peak hour speed:
        13.4-23.6 km/hr  
    • Location of busway lanes:
        Varies; mainly centre of roadway  
    • Total length of dedicated busway:
        64.1 km  
    • Length including mixed traffic portions:
        56.3 km  
    • Operation and Service:
    • Network of routes and corridors:
    • Buses operating both in & out of BRT corridors:
    • Most bus passengers in BRT corridors carried by BRT buses:
    • More than one BRT bus operator:
      Not Applicable
    • Throughput >20,000 passengers/hr (one direction):
    • Throughput >10,000 passengers/hr (one direction):
    • Carries more than a mixed traffic lane (3000 pphpd):
    • Competitively bid operating contracts:
    • Payment per bus-kilometre rather than per passenger:
    • System control centre:
    • Net time saving for bus passengers in corridor:
    • BRT system coverage (2-way roads) (1 fare):
        62.5km   [http://www.buenosaires.gob.ar/movilidad/metrobus/metrobus-del-bajo]
    • Operational mode:
        trunk-feeder  
    • Routes operating both inside & outside BRT roads:
        0  
    • Routes operating only in busway corridors:
        71   [http://www.buenosaires.gob.ar/movilidad/metrobus/servicios-del-metrobus]
    • Fare type (flat fare or distance-based):
        distance-based  
    • Median smart card fare:
        2.7-6.75peso  
    • Average bus occupancy (peak hour, direction & point):
        40  
    • Number of corridors:
        8  
    • Type of fare collection / verification technology:
        Card  
    • Stations:
    • >1 substop at >75% of stations (requires overtaking):
    • >1 stop position at stopping area at >75% of stations:
    • Sliding doors in BRT stations:
    • Station size based on passenger demand:
    • Full weather protection on most station platforms:
    • Full weather protection on all station platforms:
    • Covered station access:
    • Escalators/lifts at >20% of stations with bridges/tunnels:
    • Real-time CCTV surveillance at all stations:
    • Number of BRT stations:
        122  
    • Most station substops:
        varies  
    • Station platform width (including walls & doors):
        3.5m  
    • Station platform height:
        ~15cm  
    • Average distance between stations:
        580.7m  
    • Location of bus doorways:
        Right side  
    • Infrastructure:
    • Enhanced station (more than just a bus shelter):
    • Overtaking lanes at more than 75% of stations:
    • Includes BRT-only tunnels or bridges:
    • Stations away from intersections:
    • Low-emission vehicle technology (≥Euro III):
    • Automated fare collection and fare verification:
    • Stations with functioning passing lanes:
        100%  
    • Number of BRT depots:
        2  
    • Communications:
    • Real-time next bus information displays:
    • Distinctive BRT buses:
    • Distinctive marketing identity for system:
    • Distinctive BRT stations:
    • High-quality passenger information at stations:
    • High-quality passenger information on buses:
    • Audio announcements on BRT buses:
    • Access and Integration:
    • Bike sharing in vicinity of BRT stations:
    • Wheelchair accessible stations:
    • Bicycle parking at BRT stations:
    • Segregated bike lanes along main corridor(s):
    • Improvements to nearby public space:
    • BRT Vehicle:
    • Number of doors in BRT buses:
        2 on right  
    • BRT vehicle length:
        12m  
    • BRT vehicle fuel:
        Diesel  
    • Others:
    • BRT Standard score (GOLD, SILVER, BRONZE):
        BRONZE  
    • Public transport mode share (%, excluding walking):
        45%  
    • Urban area inhabitants:
        2.89 million  
  •  No
     Yes
     Partial
    • Who We Are
      • ITDP-CHINA
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • Other Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
    • 11th Floor, Zhujiang Planning Building Jianshe Dama Lu, Guangzhou, China. 510060
    • phone: (86-20) 83860931
    • Rm 43, 8/F, Beijing International Hotel, #9 Jianguomennei Avenue, Beijing, China. 100001
    • phone: (86-10) 85323451
    • chinaoffice@itdp.org
    © 2016 ITDP