Institute for Transportation and Development Policy

Promoting sustainable and equitable transportation worldwide

  • 中文
  •  
    • Who We Are
      • ITDP China
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • 0ther Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
      BRT Database > 
    • Segregated busways or bus-only roadways
    • Distinctive BRT buses
    • Network of routes and corridors
    • Enhanced station (more than just a bus shelter)
    • High peak period operational speed (>20km/hr)
    • Most bus passengers in BRT corridors carried by BRT buses
    • Net time saving for bus passengers in corridor
    • Overtaking lanes at more than 75% of stations
    • Throughput >10,000 passengers/hr (one direction)
    • Throughput >20,000 passengers/hr (one direction)
    • Carries more than a mixed traffic lane (3000 pphpd)
    • Payment per bus-kilometre rather than per passenger
    • Pre-board fare collection and fare verification
    • Level boarding and alighting
    • Sliding doors in BRT stations
    • Includes BRT-only tunnels or bridges
    • Buses operating both in & out of BRT corridors
    • Competitively bid operating contracts
    • More than one BRT bus operator
    • No operational subsidy from government
    • Buses paid for by operators rather than government
    • Independently operated fare collection system
    • Oversight from an independent entity/agency
    • Low-emission vehicle technology (≥Euro III)
    • Automated fare collection and fare verification
    • Station size based on passenger demand
    • Full weather protection on most station platforms
    • Full weather protection on all station platforms
    • Covered station access
    • Escalators/lifts at >20% of stations with bridges/tunnels
    • System control centre
    • Real-time next bus information displays
    • Signal priority or grade separation at intersections
    • Distinctive marketing identity for system
    • High capacity BRT buses
    • High-quality passenger information at stations
    • Audio announcements at stations
    • High-quality passenger information on buses
    • Audio announcements on BRT buses
    • Bicycle parking at BRT stations
    • Segregated bike lanes along main corridor(s)
    • Wheelchair accessible stations
    • Improvements to nearby public space
    • BRT authority plans and controls the system
    • Stations away from intersections
    • Bike sharing in vicinity of BRT stations
    • Distinctive BRT stations
    • >1 substop at >75% of stations (requires overtaking)
    • >1 stop position at stopping area at >75% of stations
    • Real-time CCTV surveillance at all stations
    • Physical BRT laneway dividers
    • None
     > Sliding doors in BRT stations:
    • Ahmedabad:
    • Amsterdam:
    • Bangkok:
      Sliding doors & air-con at the two terminal stations
    • Beijing:
      Newer stations have sliding doors
    • Bogota:
    • Brisbane:
    • Cali:
      Many not functioning or malfunctioning
    • Cape Town:
    • Changde:
    • Changzhou:
    • Chengdu:
    • Curitiba:
    • Dalian:
    • Guangzhou:
    • Hangzhou:
    • Hefei:
      Yes on east-west corridor, no on north-south
    • Islamabad:
    • Istanbul:
    • Jakarta:
      Doors are left open
    • Jinan:
    • Johannesburg:
    • Kuala Lumpur:
    • Lanzhou:
    • Leon:
    • Lianyungang:
    • Lima:
    • Los Angeles:
    • Mexico City:
    • Nagoya:
    • Nantes:
    • Paris:
    • Pune:
    • Quito:
    • Seoul:
    • Shaoxing:
    • Urumqi:
    • Utrecht:
    • Xiamen:
    • Yancheng:
    • Yichang:
    • Yinchuan:
    • Zaozhuang:
      43 with sliding doors, 13 without
    • Zhengzhou:
    • Zhongshan:
    • Zhoushan:
    • Nanning:
    • Bunous Aires:
    • Wuhan:
    • Guiyang:
    • Wenzhou:
    • Yongzhou:
    • Fuzhou:
     No
     Yes
     Partial
    • Who We Are
      • ITDP-CHINA
      • Our Team
      • History of ITDP
      • Jobs
    • What We Do
      • BUS 2.0
      • TOD
      • NMT
      • Parking and TDM
      • Shared Mobility
    • Where We Work
      • GuangZhou
      • YiChang
      • LanZhou
      • TianJin
      • Other Cities
    • News
    • Library
      • Publications
      • BRT Data
      • Transport Photos
      • ITDP Videos
      • Bicycle Data
      • Dockless Bike
    • Site Visit
      • Introduction
      • Guangzhou delegations
      • Yichang delegations
    • Contact Us
    • 11th Floor, Zhujiang Planning Building Jianshe Dama Lu, Guangzhou, China. 510060
    • phone: (86-20) 83860931
    • Rm 43, 8/F, Beijing International Hotel, #9 Jianguomennei Avenue, Beijing, China. 100001
    • phone: (86-10) 85323451
    • chinaoffice@itdp.org
    © 2016 ITDP